| Typical profile application | Temporary retaining walls, cofferdams, light quay walls | Permanent retaining walls and deeper excavation support | High bending-moment retaining walls and marine structures | Heavy-duty permanent walls with reduced wall width |
| Profile type | Hot-rolled U-shaped sheet pile | Hot-rolled U-shaped sheet pile | Hot-rolled Z-shaped sheet pile | Hot-rolled Z-shaped sheet pile |
| Common steel grade | S355GP | S355GP or S390GP | S355GP | S390GP or equivalent high-strength grade |
| Minimum yield strength | 355 MPa | 355–390 MPa | 355 MPa | 390 MPa |
| Typical thickness range | 8–12 mm | 10–16 mm | 9–15 mm | 12–18 mm |
| Typical section modulus | 800–1,600 cm³/m | 1,200–2,400 cm³/m | 1,500–3,000 cm³/m | 2,000–3,500 cm³/m |
| Approximate mass | 55–85 kg/m² | 75–115 kg/m² | 70–110 kg/m² | 95–140 kg/m² |
| Available pile lengths | 6–18 m; longer lengths subject to production planning | 6–24 m | 6–30 m | 8–30 m |
| Interlock performance | Suitable for normal driving conditions; check interlock tolerances | Improved stiffness and durability for repeated driving | High structural efficiency with continuous interlocks | Designed for high load capacity and demanding driving conditions |
| Applicable standards | EN 10248; EN 10249 available by order | EN 10248; ASTM A572 alternatives available by order | EN 10248; project-specific inspection available | EN 10248; third-party inspection available |
| Indicative price range | USD 800–1,050 per metric ton | USD 850–1,150 per metric ton | USD 900–1,250 per metric ton | USD 1,000–1,400 per metric ton |
| Price basis | Indicative mill price; freight, taxes, and coating excluded | Indicative mill price; final price depends on grade and quantity | Indicative mill price; logistics quoted separately | Indicative mill price; inspection and special treatment may add cost |
| Minimum order quantity | Approximately 100 metric tons | Approximately 150 metric tons | Approximately 200 metric tons | Approximately 200 metric tons |
| Production lead time | 3–5 weeks for standard sections | 4–6 weeks | 5–8 weeks | 6–10 weeks |
| Typical sea freight transit | 15–35 days, depending on destination | 15–35 days, depending on destination | 15–40 days, depending on destination | 15–40 days, depending on destination |
| Quality documentation | Mill test certificate, dimensional report, packing list | Mill test certificate, dimensional report, inspection records | Mill test certificate, dimensional report, traceability records | Mill test certificate, traceability records, third-party inspection option |
| Optional services | Cutting, drilling, bundling, basic corrosion protection | Cutting, drilling, welding, lifting holes, coating | Cutting, drilling, corner piles, connectors, coating | Fabrication, connectors, cathodic protection compatibility review, coating |
| Best selection priority | Lowest initial cost for standard applications | Balanced strength and availability | High bending efficiency and reduced wall width | Maximum structural capacity for demanding projects |