| 1 | Profile A | Western Europe | Hot-rolled structural steel workshop | 8,000–30,000 m²/month | US$350–650 | 8–14 weeks | 4–8 weeks | Traceable steel certificates, documented welding procedures, dimensional inspection, factory coating records | Full structural design, fabrication drawings, connection engineering, and local code coordination | 9.0 | Higher labor and compliance costs; strong engineering reduces rework and approval delays |
| 2 | Profile B | North America | Pre-engineered metal building system | 10,000–45,000 m²/month | US$280–520 | 8–16 weeks | 4–7 weeks | Certified material testing, bolt-tension verification, coating inspection, documented shop inspections | Standardized engineering packages with optional insulation, doors, cranes, and mezzanines | 8.8 | Standardized components accelerate production; freight and regional code requirements affect total cost |
| 3 | Profile C | East Asia | Light-gauge steel and portal-frame hybrid | 15,000–60,000 m²/month | US$180–360 | 5–10 weeks | 3–6 weeks | Mill certificates, weld visual inspection, production checklists, coating-thickness records, pre-shipment inspection | Basic structural engineering with optional seismic, wind, thermal, and equipment-load calculations | 8.1 | Large production volume lowers unit cost; inspection scope and specification clarity strongly affect quality |
| 4 | Profile D | Central Europe | Insulated steel-frame workshop package | 6,000–25,000 m²/month | US$300–560 | 8–13 weeks | 4–8 weeks | Panel fire-performance documentation, steel traceability, weld inspection, thermal-bridge detailing | Detailed envelope design, condensation analysis, fire strategy, and energy-performance documentation | 8.7 | Higher-performance panels and fire compliance increase upfront cost but improve operational efficiency |
| 5 | Profile E | South Asia | Bolted steel portal-frame workshop | 7,000–35,000 m²/month | US$160–330 | 6–12 weeks | 4–8 weeks | Steel-grade certificates, weld inspection, bolt testing, coating checks, third-party inspection options | Standard design package with project-specific wind, seismic, and foundation reactions available | 7.8 | Competitive fabrication cost; port distance, site supervision, and documentation quality influence schedule |
| 6 | Profile F | Middle East | Heavy-duty steel workshop with high-temperature envelope options | 5,000–28,000 m²/month | US$240–480 | 7–14 weeks | 4–9 weeks | Corrosion-protection specifications, coating-system records, weld inspection, wind-load and temperature checks | High-temperature insulation, dust-control detailing, ventilation coordination, and equipment-load design | 8.2 | Corrosion protection, insulation, ventilation, and crane requirements can significantly increase project cost |
| 7 | Profile G | Oceania | Cold-formed steel and structural steel combination | 4,000–18,000 m²/month | US$320–620 | 9–16 weeks | 5–9 weeks | Local code compliance, cyclone or seismic calculations, material traceability, installation quality records | Detailed local engineering, site-specific hazard design, and authority submission support | 8.9 | Remote logistics and strict site-specific design requirements raise cost but reduce weather-related risk |
| 8 | Profile H | Latin America | Economical portal-frame steel building | 5,000–22,000 m²/month | US$190–390 | 7–13 weeks | 4–8 weeks | Basic steel certificates, weld inspection, bolt checks, paint or galvanizing records, delivery inspection | Standard engineering with optional local wind, seismic, and industrial-equipment design | 7.7 | Material availability, import duties, and local erection capability are major cost and schedule variables |
| 9 | Profile I | Eastern Europe | Pre-engineered steel workshop with modular accessories | 7,000–32,000 m²/month | US$230–450 | 7–12 weeks | 4–7 weeks | Welding procedure records, steel traceability, CNC cutting reports, coating inspection, packing lists | Parametric design, modular office blocks, crane-support options, and construction drawing packages | 8.3 | Modular detailing improves construction speed; customization and transport distance increase cost |
| 10 | Profile J | Africa | Standard steel frame with locally assembled cladding | 3,000–15,000 m²/month | US$210–430 | 8–16 weeks | 5–10 weeks | Material certificates, basic weld inspection, corrosion-protection checks, site acceptance inspection | Standard structural package with optional local sourcing and site-adaptation support | 7.5 | Local labor and materials may lower cost, while shipping, infrastructure, and site access may extend the schedule |